Limb and high altitude operations

Lín biān jí gāo chù zuòyè rényuán bìxū shǐyòng wǔ diǎn shì shuānggōu ānquán dài ānquán dài shǐyòng bìxū cǎiqǔ gāo guà dī yòng yuánzé, qiě guà diǎn yào láogù cáiliào jí gōngjù rú bù shǐyòng yīng fàng rù gōngjù xiāng huò gōngjù bāo nèi, fángzhǐ wùliào zhuìluò shāng rén gāo chù zuòyè yìng zuò hǎo wéi lí, qiě yào yǒu jiānhù rényuán jīng ān wěi huìqiān hé zhī gāo chù zuòyè shēnqǐng dān wèi jīng shēnqǐng yánjìn chāichú lín biān fánghù shèshī zuòyè hòu xū jiāng xiànchǎng qīnglǐ gānjìng 展开 128 / 5000 翻译结果 Workers on the edge and high places must use the five-point double-hook safety belt. The safety belt must be high-hanging and low-used, and the hanging points must be firm. Materials and tools should be placed in a tool box or tool bag if they are not used to prevent materials from falling. Hazardous work should be fenced, and there should be an application form for high-altitude work signed by the safety committee by the guardian. It is strictly forbidden to remove the border protection facilities after the operation. The site must be cleaned up.
01-26

Lifting operation management

1. Qualification document review before operation (one machine and three certificates) 2. Whether the hoisting device is in good condition 3. Whether the hook ring and the anti-slip tongue of the hook are normal 4. The supporting bottom sleeper of the crane protects the ground, pay attention to the supporting feet and the ground Is it stable? 5. Hang the work area to warn the fence, and send the traffic management personnel to control it. 6. The lifting port operator does use the fall arrester and the safety belt.
01-26

Engineering Quality Management Plan

Daily 0730 Toolbox meeting meeting key points (all personnel) Call the number of workers on the day of the day Confirm the work content of the day Confirm the hazardous work application is completed Reiterate the safety construction requirements Announce the previous day’s illegal construction and the punishment content Check the contraband ) Confirm that the work content of the day is completed. Review the lack of work on the day and the items to be coordinated. Confirm the work content of tomorrow
01-26

Equipment material management plan

General requirements for temporary storage of materials. The temporary storage of materials must be marked on site (not expired). High-risk items such as chemicals must be placed in a safety cabinet, PM cart or metal container. The triangular cones and connecting rods must be enclosed at right angles, and the base of the warning cone must be enclosed. The size of the temporary storage area for materials in the same direction on all sides should be moderate, and the warning fence should not be larger than one meter of the temporary storage. The temporary storage area should be of appropriate size, and must not occupy the front of the EMO, fire extinguisher, and fire hydrant box, and no tools or materials should be stacked Wastes are removed outside the factory every day before work
Previous page
1

EPOWER INTERNATIONAL ( SHANGHAl )CO.,LTD.

 

Company Address: 4th Floor, Unit 7, No.159 Tianzhou Road, Xuhui District, Shanghai
Tel:
86-21-54452800
Email:shenlong@epower88.com
Web:www.quanfeng.com

Copyright © 2021 Quanfeng Electromechanical International Trade (Shanghai) Co., Ltd. All Rights Reserved    ICP备13018365号     300.cn    shanghai